• Chongqing Hengtairail Equipment Co.,Ltd.
    Jonathas
    The coupler they suggested are quite suitable to replace old ones. Price is reasonable, and looking forward to receive the thhem.
  • Chongqing Hengtairail Equipment Co.,Ltd.
    Jose
    The DF8B spare parts I got are all correct. Lead time is fast, and anytime I have problems, Sunny are always here to help me. Thanks her a lot,and looking forward to our future cooperation again.
Contact Person : Wei Dong
Phone Number : +86-13368201198
whatsapp : +8613368201198

Railway Fire Resistant Gangway In Train NR Steel Train End Gangways

Place of Origin CHINA
Brand Name HTR
Minimum Order Quantity 10 SETS
Packaging Details Carton
Delivery Time within 45 days
Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram

Contact me for free samples and coupons.

whatsapp:0086 18588475571

wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Name Railway Rubber Diphragem Shape Tube
Material NR And Steel Working Temperature -40℃-+40℃
Relative Humidity ≤95% Altitude ≤1500m
Maximum Wind Speed ≤15m/s Fire Resistance DIN 5510-2 S1
Highlight

Fire Resistant Gangway In Train

,

Gangway In Train NR Steel

,

NR Steel Train End Gangways

Leave a Message
Product Description

Product review

A gangway connection (or, more loosely, a corridor connection) is a flexible connector fitted to the end of a railway coach, protecting from windy and raining and enabling passengers to move from one coach to another without danger of falling from the train. It can be divided to following types:

Iron vestibule diaphragm

Rubber vestibule diaphragm

Pucker vestibule diaphragm

 

Product specification

 

Standard TB/T3094-2015 eqv UIC
Item Standard data(on test piece)
Hardness (Shore A) 73±5
Tensile strength(MPa) ≥19
Elongation(%) ≥440
Resistand to tearing(KN/M) ≥20*2

Flexibility

-30℃≥85% 20℃≥85%

70℃≥85%

after aging for 7 days at 70℃ 0-10 shore A
Resistance to Abrasion ≤0.3(cm3/1.61km)

 

Resistance to Ozone

crake length≤10mm*3 crake depth≤1mm*4
Resistance to fire DIN 5510-2 S1
flexural property(5*104) No crack
brittleness temperature ≤-50

 

 

Structure

The main components of rubber gangway are steel frame, rubber sheet which consists of horizontal and vertical tube, inner&outer steel pressing plate and fixing bolts

 

Frame material:Q235 Thickness:.

 

Tube Width

It can be customizedThe width of our horizontal rubber is 1650mm, which allows 1200mm width of door.

 

Tube Height

It can be customized. The longest size of our vertical rubber can reach 2100mm.

 

 

Drawing

Railway Fire Resistant Gangway In Train NR Steel Train End Gangways 0

Production Equipment

Railway Fire Resistant Gangway In Train NR Steel Train End Gangways 1Railway Fire Resistant Gangway In Train NR Steel Train End Gangways 2Railway Fire Resistant Gangway In Train NR Steel Train End Gangways 3

Test Equipment

Railway Fire Resistant Gangway In Train NR Steel Train End Gangways 4Railway Fire Resistant Gangway In Train NR Steel Train End Gangways 5

Application

Railway Fire Resistant Gangway In Train NR Steel Train End Gangways 6Railway Fire Resistant Gangway In Train NR Steel Train End Gangways 7

Related product