-
JonathasThe coupler they suggested are quite suitable to replace old ones. Price is reasonable, and looking forward to receive the thhem.
-
JoseThe DF8B spare parts I got are all correct. Lead time is fast, and anytime I have problems, Sunny are always here to help me. Thanks her a lot,and looking forward to our future cooperation again.
JZ-7 Train Brake Valve 500kPa 600kpa Railway Braking System

Contact me for free samples and coupons.
whatsapp:0086 18588475571
wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xProduct Name | Railway Brake Valve JZ-7 Parts | Ambient Temperature | -40℃~50℃ |
---|---|---|---|
Package | Export Package | Constant Pressure Of Train Pipe | 500kPa, 600kpa |
Application | Railway Diesel Locomotive | ||
Highlight | JZ-7 train brake valve,train brake valve 500kPa 600kpa,500kPa Brake Valve Railway Braking System |
Train brake valve JZ-7 railway coach brake valve
JZ-7 Brake valve may be used not only on passenger locomotives but also on freight locomotives.
It has the ability to gradually release at passenger locomotive, and directly release at freight locomotive.
JZ-7 mainly consists of automatic brake valve (large brake), separate brake valve (small brake), relay valve, distribution valve, application valve ect.
Product Name | Railway Brake Valve JZ-7 Parts |
Ambient temperature | -40℃~50℃ |
Package | Export package |
Constant pressure of train pipe | 500kPa, 600kpa |
Application | Railway diesel locomotive |
Performance:
1. Time for initial charge of pressure reservoir of distributing valve from 0 to 460 kPa : 50~60s
2. Time for initial charge of pressure reduction reservoir of distributing valve from 0 to 480 kPa : 55~65s
3. Effective local reduction of brake pipe (KPa): 25~35
4. Local reduction should take effect before brake pipe of the single locomotive reduces pressure to 20 kPa. At the same time, the main valve acts: starting local reduction and brake cylinder lifting pressure
5. Graduated release times after in full service application: not less than 5 times (at the passenger train position)
6. Time for pressure reduction in equalizing reservoir in service application from 500KPa to 360KPa (S): 5~7
7. Max. brake cylinder pressure in full service application (KPa): 340-360
8. Time for build-up of brake cylinder pressure in full service application (S): 5-7
9. Time for release of brake cylinder pressure from 350KPa to 35KPa (S): 5~8
10. Time for exhaust of brake pipe to 0 in emergency application (S): within 3s
11. Max brake cylinder pressure after emergency application (KPa): 420~450
12. Time for build-up of brake cylinder pressure to max. after emergency application (S): 5~7
Performance of independent braking:
Highest brake cylinder pressure in full application position (KPa): 300
1. Time for build-up of brake cylinder pressure from 0 to 280KPa (S): within 3s In running position,
2. time for reduction of brake cylinder pressure from 300Kpa to 35Kpa (S): within 4s
Application
Related products
1. MUD distributor valve
2. Brake cylinder
3. RGC-1A Sensor Valve
4. Auxiliary reservoir
5. Air brake hose assembly
6. Throttle
7. Slack Adjuster
8. Caboose Valve
9. Angle cock